Department of Public Works     
 
  Final Environmental Impact Report /
Environmental Assessment
 
engineering home
la loma bridge project home
location map
la loma bridge images
final EIR / EA
bridge retrofit / rehabilitation
community involvement
feedback
public works home

For your convenience the links below will take you to the various parts of the Final EIR/EA in PDF format. 

Cover
Signature Page
FONSI
General Information Page
Table Of Contents
Summary Chapter
 
Chapter 1 The Proposed Project
Chapter 2 Affected Environment, Environmental Consequences, and Mitigation Measures
Chapter 3 Discussions Required by CEQA
Chapter 4 Consultation and Coordination
Chapter 5 List of Preparers
Chapter 6 Distribution List
Chapter 7

Persons and Organizations Consulted

Chapter 8 Bibliography
Chapter 9 Responses To Comments
 
Appendix A Acronyms
Appendix B Notice of Preparation/Environmental Checklist
Appendix C NOP Comments and Responses
Appendix D Title VI Statement
Appendix E Consultation with U.S. Army Corps of Engineers, California Department of Fish and Game, and U.S. Fish and Wildlife Service
Appendix F Consultation with Native American Tribes and Individuals
Appendix G Technical Reports
  Cover
  Air Quality Report
  Construction Noise Memo
  Hazardous Materials Memo
  Historic Property Survey Report
  Natural Environment Study
  Geology Investigation
  Section 4f-6f Report
  Traffic Analysis Memo
  Visual Impact Study
  Water Quality Study

 

 
  100 N. Garfield Ave.  3rd Floor  Pasadena, CA 91101